Educational Building and Gathering Space
Through a master planning study prepared by Vandergriff Group Architects in 1995, this growing congregation’s first phase of the plan included a two story $9.8 million educational building. This new structure was linked to the existing worship center by wide multi-directional corridors accentuated by large open rotundas at cross circulation points. These corridors will link future building programs.